From: route@monster.com
Sent: Friday, April 08, 2016 12:13 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 PMP
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Ashfaq M Shaikh
Project
Scheduler PROFESSIONAL
PROFILE Highly-reliable and experienced
Project Scheduler with over 11 years of experience in Project
Management office. Excellent knowledge in Project Planning & Scheduling.
Ability in focusing on more strategic responsibilities. Have handled critical
and challenging projects from gathering requirement stage to implementation
stage and ensured that the projects gets implemented to the exact
specifications in stipulated time with quality. Ability to navigate the
organization and resolve conflicts. Also possess these exceptional
organizational, oral/written communication, interpersonal, analytical, and
problem resolution skills. Able to work in both independent and collaborative
working environments. Technical
Skill ·
Primavera P6
and Microsoft Project ·
AutoCAD 3D
and Ad ICPR ·
Deltek
Vision & NewForma ·
Microsoft
Office (Outlook, Excel, Power Point, Word) PROFESSIONAL
EXPERIENCE Project
Scheduler –. Primera Engineers, Ltd Chicago
IL Jan 2015 – Aug 2015 · Supported the ComEd PMO by
conducting a variety of analyses on the P6 Primavera schedule for
Transmission and Distribution projects. · Worked with Integrated
Master Plan (IMP) and Integrated Master Schedule (IMS) to assist the Project
Management leadership with decision making and planning · Ensured timely project
completion in coordination with project management · Perform schedule analysis
to track deltas between planned and actual dates and durations · Develop different dashboard
report in Excel by using data derived from P6 · Created and generated
different of types of reports within P6 for PMO. · Assist with progressing
construction schedules · Performed project
regulatory requirement evaluation to ensure effective enforcement. Project
Scheduler –. CNA
Chicago IL March 2014 – August
2014 · Created multiple project
schedule plan for baseline in Primavera-P6 in a very fast paced work
environment for Project Management office · Implemented best practice
project management planning policy, processes and procedures on projects. · Identifying and managing
risk register and analysis process. · Creating Budged Control
Document for Financial and Accrual Purpose. · Develop detailed cash flow
from schedule. · Performed different type
analysis like EVM, CPI, SPI Critical path, & Forecast . · Establishing the work
breakdown structure (WBS), determining the work activity duration and
establishing the proper work flow logic ties Ashfaq M Shaikh Page 2 of 4 Project
Planner/Scheduler –. TekSystem.
Bloomington IL Sep 2012 – Nov 2013 · Created and develop project
schedule plan in Primavera-P6 · Perform weekly schedule
updates to ensure all task and critical path items are reported. · Worked with engineering
staff to identify workflow and to develop standard project plans based on
this workflow. · Worked on projects
employing SDLC Waterfall as well as Agile methodology · Performed Earned value
project/performance management (EVPM) for measuring project performance
and progress · Monitor and analyze SPI,
CPI, EV and manpower reports · Create and send out Project
health, EVM, Milestone, Budget and other metrics reports. · Implementing Project Management
Office methodologies culture with employees and administration who are
new to handling. Resource Management/Usage Analysis · Integrate subcontractor
& vendor schedules. · Facilitating Planning
section and other meeting with Core Team to determine project requirements,
collect status, percentages completions and assist with tasks. · Project Coordinating and
Risk Estimating to determine what potential risks are anticipated during the
project. · Assist with development /
update of project controls procedures and work processes as needed · Analyzes, evaluates, and forecasts
current status against an established baseline schedule. Project Control Analyst –.
Grace & Naeem Uddin Inc. Sunrise , FL July 2009 – July 2012 · Revised and managed the
Engineering, Procurement and Construction EPC schedule. · Establish and maintain
Project control plans and schedules, including Project Contract Plan, Gant
Charts and progress S-Curves Analyse and propose improvements to schedules,
including use of critical path analysis and resource loading. · Monitoring the execution of
project milestone, activities and work. · Use EVM, SPI,
CPI to assure project goals performance & progress are being
properly maintained. · Assesses the impact(s) of
design or construction changes and schedule slippages · Implemented best practice
project management office planning policy, processes and procedures on
projects. · Provide timely advice to
mitigate adverse developing trends. · Provide project progress
report including variance analysis against approved project baseline for
activities, milestones and dependencies. · Performed detailed analysis
of all plant areas and functions for inclusion in schedule. · Monitor, analyze, and audit
progress against the schedule on a fortnightly/monthly basis and to notify
management of schedule problems and any deviation. · Monitors resource
assignments for accurate allocation against staffing plan to ensure proper
utilization. Ashfaq M Shaikh Page 3 of 4 Project Engineer-- Hanson Walter
& Associates, Inc. Kissimmee,
FL July 2006 – Oct 2008 Major Project design and development 3000
Acres Land development Subdivision ·
Establish
and maintain Project control plans and schedules, including Project Contract
Plan, Gant Charts and progress S-Curves Analyze and propose improvements to
schedules, including use of critical path analysis and resource loading ·
Develop
detailed storm water management Plan ·
Develop
and maintain oil and gas industry Construction schedule in P6. ·
Prepare
and make presentations to City and County Planning department. ·
Design
and monitoring of Utilities project for KUA ·
Prepare
Permit package for Zoning, Subdivision regulation, DOT Fire department and
other agencies. ·
Site
Visiting and doing analysis for planning. ·
Creating
As- Built Plan. ·
Coordinating
and having planning section meeting with other government agencies. ·
Develop
detail engineering cash flow, track job hours, budget in schedule using
Primavera P6 and provide man power histogram and man-power density analysis. ·
Participating
in project team and discipline leads bi-weekly meeting. ·
Prepare
and issue Bi-weekly update schedule and cost report including CPI, SPI,
S-curves, schedule look ahead, baseline variances, impacts/risks and
monitoring and reporting critical paths & schedule performance. ·
Offer
Suggestion to the Project Manager & Superintendent on the
compliance of the subcontractors and vendors performance. Project
Planner / Coordinator –Tasnim Uddin & Associates.Inc. Miami,
FL May 2000 –2006 · Major
Project :Airport. Oil and Gas Industrial Plants, Bridge &
Road way. · Worked
with client/owner/PMC on large scale of EPC project · Monitored
and ensured engineering duties in scheduling,
permitting, coordination, quantity estimation & code interpretations.
Review and process shop drawings. ·
Create
equipment, resource, and material loaded schedule in Primavera P6. · Executed
Lanchile Oil and gas pipleine project using standardized plan schedule
procedures and documentation. · Acted
as key liaison between stake holder, consulting firm and government departments. · Worked
in Project Management Office for a MIA Project 'Mid-Field Expansion phase
III-C' this project improved number of taxiways and two runways and installed
several underground utilities at Miami International Airport, the worth of
the project $100M · Participated
in Team meeting, each contractor's scope definition, bid review, analysis and
contract award. · Ensured
operational efficiency for strong project control. · Prepared
and submitted budget and cost reporting system forecast paperwork · Tracked
RFI's, developed field requisitions, and coordinated critical material
delivery and staging in a highly congested work site. Prepared cost estimates
for engineering revisions and additional scope as needed. Ashfaq M Shaikh Page 4 of 4 · Designed
and created Civil Engineering designs and construction plans. · Major
agency and projects: • Miami-Dade Building Department•
Seaports & Marine Facilities • Miami International Airport
& Facilities• FEMA Project Engineer –Dong Young
Private Limited
Mumbai, India 1999
- 2000 · Project:
Mumbai Port Trust - Replacement of Seven Major oil & petroleum submarine
pipelines from Jawahar Dweep Butcher Island to Pir Pau, Chembur, India · Coordinated
Oil and gas submarine pipeline projects to ensure on-time
completion Responsibilities included team and contractor
oversight, project development, consultation, research, design,
documentation, submission and approval. · Develop
and maintain Construction progress and tracking programs requiring
direct · Procurement,
implementation and review of quality Assurance and control, ensuring that
they are appropriate for environment, resources and other
constructability factors · Review
and process all related Documents with Municipality and Mumbai Port Trust. Site Engineer – STCC Al Kobar, Saudi
Ariabia 1996 – 1998 Project: Recreation facilities. Swimming pool,
Golf course. Guest house and Beach villa and Sewage treatment plant · Check
and review the plans & specifications for the proper construction & quality
implementation at job site. · Checking
formwork, reinforcements and all embedded items Ordering concrete and
reinforcements. · Site management
and handling the work as per specification and drawings and method of
statements. · Coordination
with technical office for any change in drawings or any revision and QA/QC
department · Making
Daily Report and reporting to Construction Manager EDUCATION & CERTIFICATION · Bachelor
of Engineering in Construction, Bombay University, India. Completed
PMP Exam Course. AutoCAD & Land Development. Primavera P6 Ad ICPR Stormwater Management. Florida Stormwater Erosion and sedimentation control Inspector. CTQP Concrete Field Inspector. ACI Concrete Field Testing Tech-Grade I |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
Hindi |
Beginner |
|
|
Urdu |
Beginner |
|
|
|